- Name of the Project: Sanitation –Buckle Canal screening
- Project cost (Rs.in Cr): 0.23
- Description:
On Provision of the screens in buckle odai the floating materials can be removed effectively and free water flow is assured and environment will be made clean. - Physical Progress: 100%
- Project End Date: 11 Oct 2018
Sanitation –Buckle Canal screening
Sanitation – Purchase of Tipper capacity 3.2 cum -10 nos
- Name of the Project: sanitation – Purchase of Tipper capacity 3.2 cum -10 nos
- Project cost (Rs.in Cr): 0.66
- Description:
“To mobilize the primary collection activities around the city in better manner. To improve the cleanliness of city and elemination of health hazards.” - Physical Progress: 100%
- Project End Date: 31 May 2019
E-Toilet
Categories
E-Toilet
- Name of the Project: E-Toilet
- Project cost (Rs.in Cr): 1.28
- Description:
The use of E-toilets are hygenic and no health hazards are anticipated. And it is a latest improvement and also it occupies minimum space and it warrents less maintanence, hence it is prioritized. - Physical Progress: 100%
- Project End Date: 08 Nov 2018
LED smart lights Phase II
Categories
LED smart lights Phase II
- Name of the Project: LED smart lights Phase II
- Project cost (Rs.in Cr): 3.92
- Description:
To construct the formation of orderly lighting arrangements in the traffic roads with eco friendly energy savings LED light and reduce the lighting polution. - Physical Progress: 100%
- Project End Date: 15 Oct 2020
Pearl Beach Road development and Kisok shop arrangemnets
- Name of the Project: Pearl Beach Road development and Kisok shop arrangemnets
- Project cost (Rs.in Cr): 0.94
- Description:
“The following improvements are programmed under smart city scheme for the effective use of public a) Providing CC pavements at Scatting yard b) Construction of Strom water drain at North beach road c) Providing Kiosk shop at Pearl beach d) Improvement of Pearl beach at North beach road” - Physical Progress: 100%
- Project End Date: 30 Jun 2020
Muthu Nagar Beach LED Fittings,providing UG cables and Highmast Light arrangements
- Name of the Project: Muthu Nagar Beach LED Fittings,providing UG cables and Highmast Light arrangements
- Project cost (Rs.in Cr): 0.59
- Description:
By securing the Muthu Nagar Park for the convineance of public entertinment including safety measures. - Physical Progress: 100%
- Project End Date: 30 Nov 2019
Smart Water Supply –Improvement of existing D system
- Name of the Project: Smart Water Supply –Improvement of existing D system
- Project cost (Rs.in Cr): 4.13
- Description:
Refer clause 2.4 & 2.5 in Smartcity Guidelines . - Physical Progress: 100%
- Project End Date: 31 Mar 2020
Solar Roof Top
Categories
Solar Roof Top
- Name of the Project: Solar Roof Top
- Project cost (Rs.in Cr): 1.58
- Description:
“It has been proposed to instal Solar Roof Top Power System in Corporation owned buildings which are having single phase and three phase service connections.Totally 227.50 KW Capacity has been Proposed to implement the installation of Solar Roof Top System. Totally 21 buildings proposed and in 19 locations are in execution. 14 Nos office buildings and 7 Nos Corporation School buildings are provided with Solar Photovoltaic Modules and Inverter pannels .” - Physical Progress: 100%
- Project End Date: 30 Nov 2021
Construction of SWD- TNSUDP
Categories
Construction of SWD- TNSUDP
- Name of the Project: Construction of SWD- TNSUDP
- Project cost (Rs.in Cr): 6.99
- Description:
Refer clause 2.4 & 2.5 in Smartcity Guidelines . - Physical Progress: 100%
- Project End Date:
Open Space making – 9 parks
Categories
Open Space making – 9 parks
- Name of the Project: Open Space making – 9 parks
- Project cost (Rs.in Cr): 4.06
- Description:
The following provision are made in compound wall security room, Toilet arrangements lighting facilities, sitting benches, foot path, play field arrangement Green space Traffic Rules and Regulations Material arrangements and water supply arrangements etc., - Physical Progress: 100%
- Project End Date: 31 Dec 2020