Solar Roof Top

Categories
Completed Projects

Solar Roof Top

  • Name of the Project: Solar Roof Top
  • Project cost (Rs.in Cr): 1.58
  • Description:
    “It has been proposed to instal Solar Roof Top Power System in Corporation owned buildings which are having single phase and three phase service connections.Totally 227.50 KW Capacity has been Proposed to implement the installation of Solar Roof Top System. Totally 21 buildings proposed and in 19 locations are in execution. 14 Nos office buildings and 7 Nos Corporation School buildings are provided with Solar Photovoltaic Modules and Inverter pannels .”
  • Physical Progress: 100%
  • Project End Date: 30 Nov 2021

 575 total views

Construction of SWD- TNSUDP

Open Space making – 9 parks

Categories
Completed Projects

Open Space making – 9 parks

  • Name of the Project: Open Space making – 9 parks
  • Project cost (Rs.in Cr): 4.06
  • Description:
    The following provision are made in compound wall security room, Toilet arrangements lighting facilities, sitting benches, foot path, play field arrangement Green space Traffic Rules and Regulations Material arrangements and water supply arrangements etc.,
  • Physical Progress: 100%
  • Project End Date: 31 Dec 2020

 600 total views

Redevelopment of Smart Anganwadi

Renovation of Burial Ground

Categories
Completed Projects

Renovation of Burial Ground

  • Name of the Project: Renovation of Burial Ground
  • Project cost (Rs.in Cr): 4.52
  • Description:
    It is proposed to construct Shed and Security Room at Burial Ground in Thoothukudi Smart City. It has a overall area 115396.28 Sq.m, Compound wall of overall length 1507.83 m is proposed around the burial ground. Partial Brickwork and grillwork is proposed between the columns 4 m c/c. A road is proposed behind the burial ground connecting the two roads on the left and right of the burial ground. The proposed road is found to have an extent of 2225 Sq.m. 15 No’s of Entrance arch is provided in each and every entrance. 8 No’s of shed each of 75 Sq.m area is proposed. 11 No’s of security room each having an extent of 4 Sq.m is provided in each Gates.
  • Physical Progress: 100%
  • Project End Date: 28 Feb 2021

 412 total views

Conversion of LED Street Lights

Categories
Completed Projects

Conversion of LED Street Lights

  • Name of the Project: Conversion of LED Street Lights
  • Project cost (Rs.in Cr): 14.41
  • Description:
    It has proposed 14920 Nos conversionallights in to 14496 Nos LED Lights as per the IGA report, CCMS – 1 No, Single Phase street light controller – 825 Nos, Primeted connector – 14500 Nos, Single phase service EB meter Box – 225 Nos,Three Phase Service 4 X 35 sqmm all cable – 225 mtrs.
  • Physical Progress: 100%
  • Project End Date: 31 Dec 2021

 403 total views

Uniform City Signage Programme

Categories
Completed Projects

Uniform City Signage Programme

  • Name of the Project: Uniform City Signage Programme
  • Project cost (Rs.in Cr): 3.02
  • Description:
    “Proposal: 1) 3 Leg Overhead Gantry Sign Board – Double Side 2) 2 Leg Overhead Gantry Sign Board – Single Side 3) Overhead Cantilever Sign Board 4) Pedestral Sign Board 5) Single Arrow Road Name Sign Board 6) Double Arrow Road Name Sign Board 7) Cautionary / Mantory Sign Board 8) Map Sign Board 9) Hazard Marker Sign Board 10) Declinator Sign Board “
  • Physical Progress: 100%
  • Project End Date: 28 Feb 2021

 400 total views

Smart Bus shelter

Categories
Completed Projects

Smart Bus shelter

  • Name of the Project: Smart Bus shelter
  • Project cost (Rs.in Cr): 1.54
  • Description:
    It is proposed to improve around the new creation of Bus Shelter with the following facilities.The total area of Corporation APC College, American hospital, Thanthi office, Government Piechnic college, Thiru V K Nagar, St.Marys School, Gymkhana club, Sub-Collector Office 4.58 sqm/Each.The following provision are made in S.S Bus Shelter, arrangements lighting facilities, sitting benches, etc.
  • Physical Progress: 100%
  • Project End Date: 31 Mar 2021

 322 total views

Purchase of Tablet for smart class room

Providing planetorium arrangements at palaymkottai road park

Categories
Completed Projects

Providing planetorium arrangements at palaymkottai road park

  • Name of the Project: Providing planetorium arrangements at palaymkottai road park
  • Project cost (Rs.in Cr): 1.67
  • Description:
    “The following provision are made in Park 1. Supply and Fixing of Sm Dome Streel Truss and Aluminium Frame 8m Outer cover, 8m Inner screen with N pressure fan-scamless screen grey color,thick fabric wwith Negative pressure inline duct fan (Patent of company)the rate includes all cost and conveyence 2. Supply and Fixing of Vivitek DU 7098z projectors with mounts Individual brightness 7000 ANSI lumnes, Contrast :20,000:1, Resolution :3840x2160pixels, Light source life (lamp- free, laset): 20,000 hours(Normal mode) the rate includes all cost and conveyence of materials materials and Jabour charges etc, complete 3. Supply and Fixing of Single Server solutions Case :4U,MB:Asus x99-MWS,CPU: Xeon E5- 1620v4,Memory :32GBDDR42400, VGA:2xNvidiaGTX 1070TI or Quadro, HDD:SSD and labour charges etc, complete Samsung PRO2TB+ backup OS: linux ,Oneserver outpus 4 Full HD images wireless and remote control fucntion with ipad fisheye lens nikon camera „Fully automatic calibration S/W,25 contenet moives from full dome library the rate includes all cost and conveyence of materials and labour charges ete, complete 4. Supply and Fixing of Surround sound system 5.1 Behringer B1200D-pro Eurolive spcaker OSL oliver systems pro 8 self Powered 8inch bass -reflex speaker the rate includes all cost and conveyence of materials and labour charges etc, complete 5. Supply and Fixing of Other projection equipment Video cables for projectors (C&E 25ft 40t/50f high speed Ultra 4K HDMI cable with Ethernet gold) (OXCORD 3core Round copper wires 45M)Cantrol cables for projector (I.ive tech Cat 6 Lan Ethernet cable (305M) the rate includes all cost and conveycnce of materials and labour charges etc, complete 6. Supply and Fixing of Custom fee,Clearence Transfer the rate includes all cost and conveyence of materials and labour charges etc, complete 7. Supply and Fixing of Air line Transportation the rate includes all cost and conveyence of niaterials and labour charges ctc, complete 8. Supply and Fixing of Project Managements the rate includes all cost and conveyence of materials and labour charges etc, complete 9. Supply and Fixing of Installation Team expenses the rate includes all cost and conveyence of materials and labour charges etc, complete 10. Stretcch fabric full system with aphony fibrette 15mm size 300x1200mm providing and fixing of Himalayan Acou sticks strech fabric system on Gi studs, 2400mum x50mm the angls |Sand 50nım fully kirurled giving it cyc strength hot dippes galvanized steel with 120gsm sink coating specially designed for aqua stick vibration managemnet and long life with backing S0mm thick insulation: APUONY fibrette 300x1200x20mum tile with NRC 1.00 to be mechanically fastermed on the Gl studs aquastical of observe wool 10mn which is ashered tô the Aqua stic pancl on the front side then 12mm/20mm vinyl tracksare screw. fixed on the Ginn ply and aquua stic panel then fabric is strech over the vinyl tracks the installed system should provide NRC of 1:00 fabric colour as per Architech choice ref. atached specialisation Got more details to be installed on GI Sutds 300x300mm cente to centre vertically strength or gripped galvanized steel with 120gsm sink coating specially designed for aqua stick vibratiobn management and long life with backing of himalayan aqua stick 50mm thick 2400mmx50mm per thickness 0.50mm and anges 15 and 50mm fiully kirurled giving in high 1000 GSM absorved wool tested as per Fire retardanta ASTMD 635/1991 insulation and IS 15061/2002 for excellent result 11. Providing fixing of Aqua stick door of 50mm having an STC rating upto 40 the door will be filled with hight Aqua stick materials of 2 layers of 2mm ISO sealed , 8mm Water proof Aqua stick ply and 30mm compressed insulation. Door frame will be made of wood frame on all sides 12. Supply and Fixing of SRO2 with tipup and back bush 20(inch)the rate includes all cost and conveyance of materials and labour charges etc,. “
  • Physical Progress: 100%
  • Project End Date: 31 Dec 2021

 403 total views