LED smart lights

Container Box Toilet -10 Nos

Categories
Completed Projects

Container Box Toilet -10 Nos

  • Name of the Project: Container Box Toilet -10 Nos
  • Project cost (Rs.in Cr): 0.49
  • Description:
    “By providing container type toilets in the respective hamlets the use of open area for public convenience is avoided and it is very good proposal in view of health condition Each container toilet contained 5 seats for ladies and 5 seats for gents with all facilities like lighting and water supply.”
  • Physical Progress: 100%
  • Project End Date: 11 Oct 2018

Sanitation –Buckle Canal screening

Sanitation – Purchase of Tipper capacity 3.2 cum -10 nos

Categories
Completed Projects

Sanitation – Purchase of Tipper capacity 3.2 cum -10 nos

  • Name of the Project: sanitation – Purchase of Tipper capacity 3.2 cum -10 nos
  • Project cost (Rs.in Cr): 0.66
  • Description:
    “To mobilize the primary collection activities around the city in better manner. To improve the cleanliness of city and elemination of health hazards.”
  • Physical Progress: 100%
  • Project End Date: 31 May 2019

E-Toilet

Categories
Completed Projects

E-Toilet

  • Name of the Project: E-Toilet
  • Project cost (Rs.in Cr): 1.28
  • Description:
    The use of E-toilets are hygenic and no health hazards are anticipated. And it is a latest improvement and also it occupies minimum space and it warrents less maintanence, hence it is prioritized.
  • Physical Progress: 100%
  • Project End Date: 08 Nov 2018

LED smart lights Phase II

Pearl Beach Road development and Kisok shop arrangemnets

Categories
Completed Projects

Pearl Beach Road development and Kisok shop arrangemnets

  • Name of the Project: Pearl Beach Road development and Kisok shop arrangemnets
  • Project cost (Rs.in Cr): 0.94
  • Description:
    “The following improvements are programmed under smart city scheme for the effective use of public a) Providing CC pavements at Scatting yard b) Construction of Strom water drain at North beach road c) Providing Kiosk shop at Pearl beach d) Improvement of Pearl beach at North beach road”
  • Physical Progress: 100%
  • Project End Date: 30 Jun 2020

Muthu Nagar Beach LED Fittings,providing UG cables and Highmast Light arrangements

Categories
Completed Projects

Muthu Nagar Beach LED Fittings,providing UG cables and Highmast Light arrangements

  • Name of the Project: Muthu Nagar Beach LED Fittings,providing UG cables and Highmast Light arrangements
  • Project cost (Rs.in Cr): 0.59
  • Description:
    By securing the Muthu Nagar Park for the convineance of public entertinment including safety measures.
  • Physical Progress: 100%
  • Project End Date: 30 Nov 2019

Smart Water Supply –Improvement of existing D system

Solar Roof Top

Categories
Completed Projects

Solar Roof Top

  • Name of the Project: Solar Roof Top
  • Project cost (Rs.in Cr): 1.58
  • Description:
    “It has been proposed to instal Solar Roof Top Power System in Corporation owned buildings which are having single phase and three phase service connections.Totally 227.50 KW Capacity has been Proposed to implement the installation of Solar Roof Top System. Totally 21 buildings proposed and in 19 locations are in execution. 14 Nos office buildings and 7 Nos Corporation School buildings are provided with Solar Photovoltaic Modules and Inverter pannels .”
  • Physical Progress: 100%
  • Project End Date: 30 Nov 2021